Altadena Residence rear exterior rendering, sliding glass doors open to the living room, kitchen, and primary bedroom In Construction · Altadena, CA
4C SAFE™ · Eaton Fire Rebuild

A main residence and ADU, rebuilding after the Eaton Fire.

The Altadena Residence pairs a 2,522 sq ft main residence with a matching 516 sq ft ADU, built on the 4C SAFE™ system as part of the Eaton Fire rebuild program. The renderings here reflect the design now moving through construction.

2,522 + 516 SFMain residence + ADU
3 / 2.5Bedrooms / bathrooms, main residence
2-CarAttached garage

Every 4C SAFE™ rebuild is steel-framed, fire-resistant, and rated 1-HR and 2-HR fire-resistive, WUI compliant, and ICC-ES listed under ESL-1695 (patent pending).

1-HR & 2-HR Fire-Resistive · WUI Compliant
ICC-ES Listed: ESL-1695 & ESR-3373 · Patent Pending
2,522Sq ft, main residence
516Sq ft, matching ADU
3 / 2.5Bedrooms / bathrooms
2Car garage
The Build

One rebuild, two structures, one panel system.

The main residence and ADU share the same 4C SAFE™ system, so both structures carry the same fire-resistant, factory-built construction and move through permitting and installation together.

One coordinated rebuild

The main residence and ADU are designed, permitted, and built as a single scope, so the property doesn't need a second disruptive construction phase later.

Fire-resistant from the frame out

Steel framing rated 1-HR and 2-HR fire-resistive gives this rebuild a fundamentally different fire-risk profile than the home it replaces.

Reviewed and ready

The design has already been reviewed by Los Angeles County, giving this rebuild a clear starting point instead of beginning the design process from scratch.

Renderings

Inside the Altadena Residence design.

These renderings reflect the main residence and ADU now moving through construction; photos of the completed build will follow.

See the Altadena Construction page for how 4C supports Eaton Fire rebuilds community-wide, the 4C SAFE™ system page for specifications and listings, or the complete project portfolio. Every 4C build is delivered through our network of partner architects, general contractors, and developers.