One coordinated 4C scope. Fewer trades to coordinate.
4C supplies and installs the exterior wall panels, interior partitions, and roof and floor framing as one coordinated scope, with labeled components and a project-specific delivery and installation sequence.
One procurement line, a documented installation sequence.
Exterior wall panels, interior partitions, and roof and floor framing arrive as one coordinated scope. Pre-labeled components and a defined sequence reduce supply-chain complexity and help following trades plan their work.
From project handoff to closeout.
This is how a typical project moves once it reaches your crew.
Project Handoff
Receive a fully configured, permitted, and certified project scope, ready for procurement.
Manufacturing
Components are manufactured to spec at our Hayward facility, consolidating multiple trades into one procurement line.
Delivery
Pre-labeled components are delivered directly to your site, sequenced for installation, with staging requirements set out in the installation plan.
Installation
4C coordinates installation with delivery and site readiness. A reach forklift (telehandler) is our preferred method for handling and placement, with equipment and staging planned for each site.
Inspection & Closeout
Every component is built to a documented, repeatable, ICC-ES listed standard, so inspections go the way you expect.
Built around the three things you're measured on.
Simplified procurement
One manufactured, certified component system replaces coordination across multiple trades and suppliers.
Reduced on-site labor
Pre-labeled, pre-engineered components help reduce onsite construction time compared to conventional stick-framing.
Consistent quality control
Every component is built to the same documented, ICC-ES listed standard, so what you install is what you specified.
One coordinated scope, not a dozen trade coordination calls.
Components show up pre-labeled, sequenced, and already reflecting a certified, permitted design, so your crew isn't reconciling framing, insulation, sheathing, and weather barrier deliveries from four different suppliers on four different schedules.
Procurement becomes one line item instead of a coordination project of its own.
Cut labor hours, not corners.
Because components are manufactured to spec and sequenced for installation, crews spend less time on layout and rework and more time actually building.
It also means fewer surprises at inspection, since every component is already built to a documented, repeatable, ICC-ES listed standard.
Our partner network.
We're constantly expanding our network of builders, contractors, architects, and developers who see the value of factory-built construction. We're proud to work with partners like Palm Coast Design Build, an integrated development, design, and construction company delivering modern residential projects throughout Southern California.
Palm Coast Design Build
Our work with Palm Coast combines their project delivery expertise with the 4C factory-built system.
The business case for the 4C component system.
4C consolidates exterior wall panels, interior partitions, and roof and floor framing into one coordinated scope. Defined details and factory production reduce onsite fabrication and simplify procurement.
We align delivery, staging and installation with the GC's schedule. Labeled components give following trades a clearer starting point, with warranty and support for the installed 4C system.
Window installation, roof sheathing and other work outside the agreed 4C scope remain coordinated interfaces with the rest of the project.